Villains Land just picked up a new piece of paperwork. A Notice of Commencement was recorded for Walt Disney Imagineering at a Magic Kingdom address that does not appear in the Central Florida Tourism Oversight District’s address database. PCL Construction is the contractor on the filing.
The filing does not name the project. But a brand-new address inside Magic Kingdom points to a new site rather than work on an existing building, and Villains Land is the most likely candidate.
What the Notice of Commencement Means
A Notice of Commencement is recorded before construction begins on a project. It lists the property owner, the contractor and the location of the work, and it is one of the first formal steps ahead of major construction.
The contractor is a familiar one. PCL Construction has a long history at Walt Disney World, and handing a new Magic Kingdom address to a large, established builder lines up with the size of what Disney has described.
That size is the big selling point. Disney has said Villains Land alone is on the scale of Star Wars: Galaxy’s Edge. The dirt area guests can see from the Big Thunder Mountain Railroad queue is shared with Piston Peak, the Cars land, which takes up close to half of it, per Disney Tourist Blog.
What Disney Has Shown for Villains Land
Disney filled in many of the blanks at D23 in August. The name is simply Villains Land. The land’s story starts with a broken Wishing Well in a dark forest, where an evil wish corrupted the well and spread its magic to the villains, who used it to build new lairs for themselves. Cruella de Vil, the Evil Queen and Dr. Facilier are among the characters Disney named.
There are two headliners. The first is a Maleficent roller coaster through Forbidden Mountain, and Imagineers said it will include elements they have never attempted before. Walt Disney Imagineering later showed a quarter-inch scale model of the coaster with swirling rockwork and a track layout that appears to include an inversion.
The second is a dark ride hosted by the Magic Mirror. Guests find the Mirror in the catacombs beneath the Evil Queen’s palace before he sends them into his Mirror Realm, which Disney said will use a mix of special effects and physical sets to bring a lineup of villains to life.
READ: Disney Files Permit for Mystery Location Near Haunted Mansion at Magic Kingdom
Still No Opening Date
Paperwork is moving, but the calendar is not. Disney has not announced an opening date, and on the earnings call this week Disney CEO Josh D’Amaro grouped both Villains Land and Piston Peak with projects coming after 2027, with no year attached.
Disney’s earnings materials list the two Magic Kingdom projects the same way, as not dated, while Monstropolis, Tropical Americas and Disney Lakeshore Lodge all carry 2027 timing.

Courtesy Disney Company, Concept Art
This filing is a good sign for anyone who has been waiting on Villains Land since Disney first announced it at D23 in 2024. A new address and a major contractor say the work is about to get more serious. Until Disney puts a year on it, though, Villains Land is a project fans can watch rise from the Big Thunder queue without knowing when they will ride anything.
Which Villains Land ride are you most excited for, the Maleficent coaster or the Magic Mirror dark ride? Let us know!
UP NEXT: Disney Files Construction Permit for Piston Peak Cars Land Area

